Re-matched tune compensation for 90 m beta* optics   -> HB  (slides)
HB presented last news from a dry run in preparation of the planned MD for the un-squeeze to 90m and studies to correct the beta-beating induced by the global tune correction at 90m using the main quadrupoles. The matching studies were done in collaboration with Thys Risselada.
The dry run of the un-squeeze revealed that Q4.R5B.b1 could not ramp down as fast as demanded which has been corrected for the MD. This could be due to wrong parameters of the circuits.

Concerning the tune correction for 90m, it appears to be possible to do this more locally using the main quadrupoles of the adjacent sectors and to correct the induced beta beating using a subset of the quadrupoles in these sectors, such that most of the rest of the machine is not affected. Even if this could be applied at each step of the un-squeeze, HB proposes to use is only at the last step. This proposal will not be tested during the forthcoming MD session.


AOB

None


Last update: 04-May-2011

MG & HB

Back to LCU Minutes