Summary notes of the LCU meeting on 13/11/2012

Present: RB, HB, LD, OD, SF, MG, EQ, BS, MS, RT, RT, AL, PH

Report from meetings


Brainstorming discussion of options for post LS1 LHC configuration -> All (slides by MG)

Rogelio will have a presentation on the forthcoming Evian workshop. Evian will be too early to decide on the running configuration after LS1. Still, it will be important to have already a well prepared first view of this subject in Evian.
MG showed slides with questions which we should discuss and try to answer. Both 25ns and 50ns options will be considered.

Points to be considered include:

SF asked for a specification of the maximum chromatic aberration which is compatible with collimation.

MG asked the question about possible interference with high-beta in case we go for ATS.  HB said we already use a separate hypercycle for the high-beta runs which de-couples these runs from the configuration used for high luminosity so that he does not expect any interference. 


AOB

None


Last update: 21-November-2012

MG & HB

Back to LCU Minutes