General Information (Gianluigi) 
Fellows: a meeting has taken place to review the fellow 
requests for the various groups. It has been decided to stabilize the fellow 
distribution to the present numbers. This means that ABP quota will stabilize to 
about 20 fellows/year corresponding to ~34% of the overall BE quota!
Achieved >1.5x1030  cm-2 
Hz with 12 bunches/beam. Next steps to 
go to 24 bunches with bunch train injection from SPS (4 bunches/train). At 
present recovering from technical stop. First evidence of top quark candidates 
presented at ICHEP2010
More information can be found in the
LHC commissioning web page
Gianluigi has asked the machine 
supervisors to continue to distribute the weekly summary on the status of the 
machines to all the machine supervisors including those in the ICE section.
SPS (from Elias):
2 magnets were changed during the 
technical stop.
Machine development session:  
				- 
				successful test of the 
				newly installed LHC collimator with button pick-ups, 
- 
				successful UA9 run with 
				good efficiency and rapid re-establishment and improvement of 
				last year performance with new goniometers and crystals; 
- 
				the installation of a 
				stainless-steel reference line with electron cloud monitor took 
				place but the LHC beam high intensity run was hampered by the 
				high outgassing of the kapton present in the electron cloud 
				monitor. The area had to be re-opened and the kapton removed. 
- 
				and MD with 50 ns LHC 
				beam and intensity well above nominal had to be cancelled due to 
				an inter-turn short on a main dipole coil. the magnet was 
				changed on Friday and the machine was back in operation on 
				Saturday for LHC filling. 
Round Table
				- Yannis: 
				
								- PS MD last week to verify whether the observed 
fluctuation of the magnetic field at injection could be related to the effect of 
								the pole-face windings of the reference magnets. 
								The results are not conclusive but it seems that 
								this cause 
can likely be discarded.
- RF team has produced a 150 ns beam with nominal bunch 
intensity. Some more work is required.
- Simone is trying to set-up a MTE cycle with electrostatic 
septum to minimize the losses on the magnetic septum.
- PS2: studies on the large wide-band RF cavities ongoing. 
Draft of the conceptual design report to be prepared by the end of September
- Non-linear dynamics conference in Greece. Various aspects 
were covered. New methods and tools were presented not only from accelerator 
physics. New tools and parameters for defining a chaotic behaviour and speed-up 
dynamic aperture estimations. Link to the conference:
								
								http://nonlinear.web.auth.gr/ 
- MD4 status: not clear whether this 
								cycle has been fully re-established after the 
								controls problems occurred last week.
- Themis Williams (staff child) 
								has been working on the 1000 turn 
measurement with BPM turn-by-turn data from PS under the supervision of Hannes and Yannis.
								
 
- Sandra:
								- PS Injection studies: The 
								ringing observed on the LHC BLM signal in the 
								injection regio is an artifact. The time 
								response of the LHC BLMs is slower than that of 
								the ACMs and the losses of the 
individual bunches cannot be resolved. The sensistivity of the LHC B:LM is also 
poorer so that the turn-by-turn losses occurring right after injection are 
								hardly 
visible. 1/3 of the losses seem to occur right at injection and the rest is distributed over few 
hundreds turns. Gianluigi and Christian suggested to look whether there 
are means to change the beam size at the injection septum by modifying the optics 
								in the injection transfer line or by acting on the emittance of 
the beams. A presentation on the status will be given at the next 
meeting.
 
- Miriam: 
				
								- finishing the data analysis of the MTE . For 
the moment no clear explanations of the fluctuation of the losses.
 
- Christian: 
				
								- LEIR should take beam next week. Some 
co-ordination issues for the shut-down. Water valves have been installed to have the 
possibility to minimize the flow on magnets and give more margin for the 
operation of the LINAC/LEIR water station, but the type of valves installed in 
not apt.
- Problems with the LEIR controls have been found (InCA) 
								and they are being 
fixed. 
- Beam instrumentation is working. 
								The remote acquisition of the Schottky 
spectra has been fixed by OP (S. Pasinelli). but the robustness with respect to 
network load and with respect to versioning of the Operating System (Windows 
XP) have to be addressed to guarantee long term maintainability. To be discussed 
								with BI
- 18 GHz source tested but X-rays 
								level too high ==> stopped by RP. No time to install additional shielding for this year.
- The plasma chamber is now stainless steel and the source 
seems to be more stable with reasonable current (20 microA at the end of LINAC3)
- LINAC4: the note on 
								LINAC4-PSB RF interface is being reviewed by 
P. Baudrenghien. New simulations with ORBIT need to be launched to study the 
								effect of a slower energy modulation as proposed 
								by the LINAC4 team. The configuration for the 
								injection hardware is being finalized and agreed 
								with ABT. The idea of having a larger painting 
								bump proposed by Christian and Michel in order 
								to minimize the risk of accidental damage of the 
								injection foil after injection has been included 
								in the design. Activation studies in the PSB and 
								the study on a possible collimation system are 
								progressing slowly and remain one of the main 
								concerns
- Christian has been 
								contacted by M. Dosanjh and M. Silari who have 
								confirmed the interest for a faciility for 
								radiobiological studies at CERN at LEIR. A 
								request for a study will be submitted.
 
  Next meeting
Monday, 9th August 2010 
at 14:00 
in room 354-1-001
Agenda
				- General information (Gianluigi)
- Injection studies (Sandra)
- Round table (all)
 