Summary notes of the LCU meeting on 05/03/2013

Present: RB, HB, RdM, LD, OD, MHF, MF, MG, PH, BH, JJ, LL, SR, GR, RT, AV RV

Report from meetings

Summary of considerations for vertical crossing angle in IR8 -> BH (slides)

As discussed in previous meetings, the larger horizontal internal crossing angle of +/- 2.1 mrad generated by the LHCb spectrometer makes it difficult to keep sufficient separation at 25 ns for one of the two required spectrometer polarities. This could be avoided using a vertical external crossing angle which is currently limited by the beam screen. There is no time to rotate the beam screen in LS1. Bernard showed to which extent a vertical crossing angle would fit for the current beam screen rotation depending on assumptions on emittances and tolerances. See the slides for details. Stefano will discuss that consequences on the change of the plane of the crossing angle with MPP and will report back to agree on the message to carry across to the LMC.


AOB 

A meeting in two weeks would interfere with the beam-beam workshop, and Tuesday in 3 weeks with the HL-LHC parameter and layout committee. It is planned to organise the next LCU meeting exceptionally on Monday the 25 March.


Last update: 25-February-2013

MG & HB

Back to LCU Minutes