Minutes of the LIS Section meeting held on 28th July 2008
Present: M. Aiba, G. Arduini, E. Benedetto, O. Berrig, M. Chanel, A. Franchi, M. Martini, Y. Papaphilippou, D. Quatraro, G. Rumolo, B. Salvant
General Information (Gianluigi)
Preparation for the injection test of Beam 1 are ongoing in preparation for the synchronization test on 8-10/8.
Volunteers are required for the LHC patrols in view of the DSO tests.
Highlights from EPAC (Yannis) - slides
One of the major highlights is the commissioning of JPARC linac and Rapid Cycling Syncrotron operated at 25 Hz and with an energy of 3 GeV
Some issues: electromagnetic interferences due to the high repetition rate, beta-beating due to the injection bump
Progress in the operation of SNS has been also reported. Losses in the injection region and reliability issues of linac have been reported
Highlights from ILCDR08 Workshop (Giovanni) - slides
CESR ring will be dedicated to the studies of electron cloud effects and cures. Simulation code comparison and possible solutions to reduce the secondary emission yield have been reviewed.
Highlights from NuFact08 Workshop (Michel) - slides
There is a lot of acitivity in the neutrino physics and in the design of a neutrino factory. A design report is expected to be written by end of 2010.
Next meeting
Monday, 11th August 2008 at 10:00 in room 354-1-001
Agenda
General Information (Gianluigi)
Status of MTE (Simone)
Highlights from EPAC08 (Elena)
Round Table (all)
A.O.B.